Projects

Zubair field hook-up well head project taam

Hook-up project

installation of (12 oil wells + 3 water injection wells ) Well head and manifold tie-in for the duration of 8 month in Zubair Field

Taam Rumaila Field

Flow line construction

Installation of flow line ,Well head and Tie-in in Rumailia Filed for duration of 3 Years .

2012-10-13-075

Khrone Metering Skids

Installation khrone Metering skids in all Zubair DGS with all piping system for duration of 1 year .

DSC02076

Truck line 42" -20Km

installation of 42″ pipeline with SOC in Fao

TAAM Engineering Co Basra

Truck line 16"

16″ Truckline -13 KM with BP in Rumailia Field

manifold installation project

EPC Contract : 16 Manifold installation

EPC Project : Installation of 16 new manifold inside all Zuabir feiled DGS ( Zubair,Zubair Misrish,Hammar,Hammar Mishrif,Rafdhiya,Safwan ) for the duration of 2 years .

DSC02992

Truck Line 12" 13 KM

Installation of 13 km truck line in zubair field

IMG_3010

Truck Line 10"

Installation of 10″ truck line 8Km in West Qurna Field

Picture 2

Two truck line 10"

2 Truck line -8Km with BP in Rumailia Field

TAAM Engineering Co Basra

Truck Line 26"

26″ Truckline -8KM with Eni in Zubair field